Perfect... lol !
But anyway, yes I have been working on the Jetta. Quite a lot actually...
I haven't wanted to post pictures yet since most of the work is of the kind you can't see.
I've been working with the electrics still, and it's really been a LOT of work.
Now the interior part and bulkhead part of the electrics are done. Routed the wires better and replaced all wires front from the firewall.
Fitted separate fuses for glow plugs, manual/automatic cooling fan control, semi-hidden engine harness, wires for extra gauges and stereo, as well
as new electric locking system with alarm and remote control. But what took most time was making it all look OEM or nicer...

Next week I'll be doing the last bits of sound deadening for the passenger compartment, and then the dash and carpets will go on!
Then the fuel lines and tank.
Then suspension and brakes. (And cooling systems fitment and modifying the mounting points for them...)
Then... It's time for engine -> hopefully running in... Late April...