I was hoping to get the engine fully bolted in yesterday, but too much running around picking up misc things and my driveway turning to black ice/sun going down around 4:30 meant that didn't quite happen.
Finished the new mount and bracket though and I'm happy with how they turned out. Subframe notched and filled back in, everything coated in zero rust. My welds are slowly getting better, but it's tough on 1/4" and 3/8" plate with my 110V mig. I should've turned the wire feed speed down even further, but it was already at 20/100 haha










And one random pic of my cars ass beside my Eddy's Jetta


Insurance on my spare vehicle runs out on Jan 5 and I don't want to insure it again. So, I don't have much time left. Fortunately I've got 3 days off between now and then (Sat, Sun, Tues) to get it all tied up. I started writing down a list of everything I need to do before it's running again, here's what I've got so far. There will probably be more!
-Install clutch/tranny
-Drop engine back in car
-Intercooler/plumbing
-Make custom downpipe
-Weld up exhaust pipe between turbo's once I know it will all fit for sure!
-Oil feed lines
-Get K24 oil return line made
-Make a line from my K14 wastegate to the intermediate charge pipe
-Set up temporary boost gauge off of intermediate charge pipe (not urgent)
-Set up my oil pressure gauge
-Set up oil temp gauge
-Remake hood release cable
-Put instrument stalks back on and put some of the interior back in
-Cross my fingers and hope that it all goes back together well!
I think it's a lot to do in 3 days of work, but should be possible! Hopefully no more big hurdles