Can this be done?
« on: October 02, 2007, 02:22:00 pm »
I am planning on rebuilding my diesel Rabbit this winter in the shop. I have already done a 4spd to 5spd conversion. After examining the engine, here's what I found: leaky injectors,leakage from fuel lines (already purchased Viton), block has alot of oil on it and oil leaking out of head and valve cover, oil consumed quikly and oil in the exaust manifolds. This looks to me like a new ring job, but I might as well replace the main and rod bearings. I plan on ordering the Level 1 master rebuild kit from VW Parts Place. However I my plan is to do a rebuild without removing the engine. Can this be done? Can I replace rings this way? This is my first rebuild, someone please help me out! thanks!


1986 Golf WVO converted.

Reply #1October 02, 2007, 02:30:45 pm

jtanguay

  • Veteran

  • Offline
  • ***

  • 6879
Can this be done?
« Reply #1 on: October 02, 2007, 02:30:45 pm »
yep all that can be done with the engine in place.  just pull the head and the pan and make sure to keep everything together (numbering the pieces helps too)


This is how we deal with porn spammers! You've been warned.

Reply #2October 02, 2007, 03:41:34 pm

rallydiesel

  • Veteran

  • Offline
  • ***

  • 1880
Can this be done?
« Reply #2 on: October 02, 2007, 03:41:34 pm »
You won't be able to remove the intermediate shaft and change the bearings with the engine in place. It would be WAY easier to rebuild the engine with it out of the car.
2006 Jetta TDI - gtb1749v, Malone 2, Frank's Titan 2 cam, VR6 clutch....
1991 Jetta TD - sold :(
2001 Golf TDI - Son's
1981 Rabbit - BEW tdi swap project

"ONCE YOU GO CLACK, YOU NEVER GO BACK"

Reply #3October 02, 2007, 09:24:59 pm

jtanguay

  • Veteran

  • Offline
  • ***

  • 6879
Can this be done?
« Reply #3 on: October 02, 2007, 09:24:59 pm »
Quote from: "rallydiesel"
You won't be able to remove the intermediate shaft and change the bearings with the engine in place. It would be WAY easier to rebuild the engine with it out of the car.


i thought it could be done, but be very very awkwards and difficult.  much easier to do outside of the engine though yes....


This is how we deal with porn spammers! You've been warned.

Reply #4October 02, 2007, 11:39:10 pm

Vincent Waldon

  • Global Moderator
  • Veteran

  • Offline
  • ****

  • 3255
    • My collection of HOWTOs
Can this be done?
« Reply #4 on: October 02, 2007, 11:39:10 pm »
And you'll be really really annoyed if you do all the work only to discover you have low oil pressure because your intermediate bearings were as good as your old rings :roll:
Vince

Edmonton, Alberta, Canada
2001 silver TDI Jetta Malone Stage 1.5 , 2001 blue TDI Jetta SBIII 216s Malone Stage 3, 1970 Bay Window bus

Gone but not forgotten: 1969/1971 Beetles, 1969/1974 Westies, 1979 Rabbit, 1986 TD Jetta, 1992 gas Jetta, 1994 TD Jetta

Reply #5October 03, 2007, 01:37:14 am

vegfuel

  • Junior

  • Offline
  • **

  • 125
Can this be done?
« Reply #5 on: October 03, 2007, 01:37:14 am »
I guess I have no choice. It's only that I just got done pulling out a 4spd tranny and then with great effort :x put in a 5spd. I guess it's worth a rebuild. Darn car only cost me $400 but I know she can go alot further. :)
1986 Golf WVO converted.

Reply #6October 03, 2007, 02:45:01 pm

lord_verminaard

  • Veteran

  • Offline
  • ***

  • 1080
Can this be done?
« Reply #6 on: October 03, 2007, 02:45:01 pm »
The engine and tranny drop out the bottom as a unit and it's surprisingly easy.  Probably easier than just dropping the tranny by itself.  In the time it would take to futz around rebuilding the block while in the car you could probably pull and install the engine 5 times.  :P

Basically:
-Drain oil, coolant, unplug wires, cables, hoses, shift linkage, exhaust, etc.  (that's the part that takes the longest!

-Pull front wheels.  Unbolt axles.  You've done this part before.  :)

-Unbolt front and rear engine/tranny mounts.

-Slide a furniture dolly, or even an old tire on some cardboard under the engine/tranny, and slowly lower the front of the car down until the engine/tranny is resting on it's own.

-Unbolt the two side mounts.  Easy to do from the top, although you will probably need to pull the battery.  Make sure the ground strap to the tranny is disconnected.

-Have a couple helpers or three pick the front of the car up carefully while  you slide the engine/tranny out.  This is where a furniture dolly helps.  It may be possible to do this with a jack by yourself but most do not go high enough.  

-Carefully set the car back on stands, drink beers, rebuild engine, installation is reverse of removal.  :)

Old VW's are great.  Not only are the engines easy to get to, there is less crap to disconnect.

Good luck!

Brendan
81 Scirocco 'S -->Soon to be m-TDI
93 Corrado SLC VR6
'86 Golf N/A Diesel  -->Wife's car
1990 Audi CQ
05 New Beetle PD TDI


"I am a man, I can change... if I have to.... I guess....."

-Red Green

Reply #7October 15, 2007, 10:12:36 pm

bkschott

  • Newbie

  • Offline
  • *

  • 7
Can this be done?
« Reply #7 on: October 15, 2007, 10:12:36 pm »
out the bottom, easy as pie