Been super slow!
Most recent progress
Floor pan welded in. Still need to put it on the lift and weld up the bottom where I let it overlap a little. (Added strength for the occasional fatty driver). Then I can por15 it all and start laying dyna mat.
Engine bay fully por15, and painted the temporary spray bomb brown.
New 15" wheels!
Test fit
Floor pans all por15'd. Tomorrow it will be dry so I can lay dynamat down. Then continue to por15 the firewall and rear panel.
Hoping to put the wiring harness in Sunday. Fingers crossed!